Bear Creek work begins

Work has begun on the On30 layout with the donor layout stripped of figures, trees and critters (mostly to be recycled), structures (for sale) and overhead baseboard structure (to allow better access and to be reinstalled later).

The next stage is to build the feature bridge, an ozsteam kit – see here and work has already begun to prepare drawings etc for this.

Also the micro engineering track and turnouts in stock will be used to determine the exact track plan to be used.

Advertisements

About rhydddu

Narrow gauge modeller in 4mm, 7mm and 16mm
This entry was posted in 7mm. Bookmark the permalink.